| You can now walk around the station proper! WireFusion has OpenGL support, so this is my first test using it. The
initial loading is a little different, but framerate is much better and the presentations can be bigger. There's nothing inside the building yet,
but you can get a good better idea of the building's size (the camera is ~6' above the ground).
The station was changed several times. By 1940, the two tower tops and train shed were removed. Click on the year buttons to
see the differences.
Navigation: Move Forward/Backward with the Up/Down cursor keys, and look around with the left mouse button pressed. |